This Session has ended
PFAS Treatment for Rural Water Systems Part 2
17th Mar
2:00pm - 2:50pm MDT
Aspen Daisy -Water
55 attended
Session Description
The purpose of the paper on PFAS treatment system design is to provide a comprehensive review and evaluation of current and emerging treatment technologies for PFAS removal and destruction. It aims to guide the design of effective, scalable treatment systems that can reliably meet regulatory standards, optimize operational performance and cost, and address site-specific water quality challenges. The paper seeks to advance understanding of treatment train integration, pilot testing approaches, and technology selection criteria to support sustainable and regulatory-compliant PFAS mitigation strategies in water supply and industrial contexts.
Attendees (55)
Josh Egle
Plant Operator A at Loveland, City of
Tim Murphy
Wastewater Operator at Fairplay, Town of
Jack Zielinski
Operator at Zielinski, Jack
Brent Bohs
Owner at Chockstone Solutions LLC
Mark Prince
Water Operator at Cherokee Park Dude Ranch
Jesse Shull
Water Operator at Estes Park, Town of
Robi Darcy
Water Treatment Manager at Basalt, Town of
Steve Potter
Beulah Valley Water
Autumn Schulz
Intern at Town of Bayfield
Joseph Hewitt
wastewater ORC at Pagosa Area W & S
Farron Hall
none at Hall, Farron
Bryon Long
Utilities System Repair Officer at Mesa Verde National Park
David Crace
Town of Ovid
Thomas Triplat
water operator at Cottonwood Springs Mobile Home Park
Sean Forbes
Systems Specialist at Cherokee Metropolitan District
Richard Ruybal
Facilities Director at North Conejos School District
+39 other Attendees