Loading...
This Session has ended

Spray-In-Place Pipe (SIPP) - Trenchless Technology Revolutionizing Underground Pipe Rehabilitation

18th Mar 2:00pm - 2:50pm MDT Goldenglow-Distribution
37 attended
In Person
Session Description

Spray-In-Place Pipe Rehab (SIPP) offers a trenchless rehabilitation process aimed at revitalizing aging underground piping systems. Capable of addressing a wide range of pipe diameters and configurations. This efficient and durable solution is designed to extend the service life of infrastructure while ensuring water quality and safety. Employing state-of-the-art robotic spray application technology, the SIPP process coats the interior of pipes with NSF/ANSI/CAN 600 approved 100% solids epoxy coating. This coating system can seal cracks and also possesses elasticity, accommodating minor structural movement". Once cured, the epoxy forms a semi-structural corrosion resistant lining, restoring original design parameters and fortifying the pipeline against future leaks and potential contaminants. The transformative potential of SIPP is an eco-friendly and cost-effective alternative for enhancing the longevity and integrity of underground water distribution systems.

Ty Forrester

USG Water Solutions
Attendees (37)
Jereme Mickey
Jeremy Schulz
Director of Public Works at Bayfield, Town of
Ronald Scheetz
Water Plant/Distribution ORC at Orchard City, Town of
Joel York
Collection System Operator at Upper Thompson Sanitation District
Corey Griffis
District Manager at Forest Lakes Metro District
Josh Martinez
Park Resource Technician at Colorado Parks & Wildlife
Chris Bornhoft
Public Works at Haxtun, Town of
JD Beyers
Assistant Manager at Flagler, Town of
Alex Baldwin
Water Systems Operator at Loveland, City of
Mike Marzolf
Certified Operator at Seibert, Town of
Allen Coyne
Board Member at CRWA
Jesus Hernandez
Maintenance Supervisor at Ordway, Town of
Jason Raysinger
12282 at Town of Ignacio
Bob Rush
town manager at Flagler, Town of
Wade A. Heuett
President at Recreation Resource Management of America
Jeremy Baker
Operations Manager at Pate Construction Inc.
+21 other Attendees