Loading...
This Session has ended

Wastewater and Water Lining Options for Systems through Challenging Areas

17th Mar 8:00am - 8:50am MDT Snowberry- Collections
60 attended
In Person
Session Description

This presentation will focus on case studies where traditional pipeline replacement may be a challenge, but relining could be an option. Relining can be done in wastewater and water pipelines and can be done in such a way to minimize downtime and environmental impacts. This presentation will go over some of the practical applications, when pipe lining is a viable option and when it might not be. Multiple example projects will be presented along with instruction on how to evaluate if a specific project should consider pipe lining as an alternative.

Attendees (60)
Raymond Garcia
Wastewater Operator at Widefield W&S District
Chad Coontz
Cross Connection Control Technician at Fort Collins-Loveland Water District
Clayton Peterson
Water and Wastewater Operations Supervisor at Meridian Service Metro
Peter Huisman
Circuit Rider- Water at CRWA
Glenn Bornholdt
Wastewater Operator at Widefield W&S District
Jason Mraz
Engineer inspector at Town of Firestone
George Hubert
Firestone
Jayeden Serl
Operator at Yuma, City of
Sterling Hinson
Field Operator at Round Mountain Water & Sanitation
Fredrick McRee
ORC at San Juan River Village MD
GREG SWANEY
SUPERVISOR at TOWN OF CASTLE ROCK WATER
Alex Baldwin
Water Systems Operator at Loveland, City of
Tyler Thompson
Water Utilities Operator 1 at Town of Berthoud
David Nameth
Administrative Coordinator at Pueblo West Metro District
Daniel Bumgarner
C&D Operator at Pueblo West Metro District
Ken Davis
Public Works Director at Town of Dinosaur
+44 other Attendees