Loading...
This Session has ended

Wastewater and Water Lining Options for Systems through Challenging Areas

17th Mar 8:00am - 8:50am MDT Snowberry- Collections
60 attended
In Person
Session Description

This presentation will focus on case studies where traditional pipeline replacement may be a challenge, but relining could be an option. Relining can be done in wastewater and water pipelines and can be done in such a way to minimize downtime and environmental impacts. This presentation will go over some of the practical applications, when pipe lining is a viable option and when it might not be. Multiple example projects will be presented along with instruction on how to evaluate if a specific project should consider pipe lining as an alternative.

Attendees (60)
Nathanael Romig
Collection System Superintendent at Upper Thompson Sanitation District
Michael Levy
C&D Manager at Evergreen Metropolitan District
Raymond Garcia
Wastewater Operator at Widefield W&S District
Ken Davis
Public Works Director at Town of Dinosaur
Julian Drew
Backflow Prevention at Limon Correctional Facility
Clayton Peterson
Water and Wastewater Operations Supervisor at Meridian Service Metro
dustin hatten
supervisor at city of greeley water department
Patrick Espinoza
WW Operator at City of Walsenburg
Lawrence Santistevan
Project Manager at Jacobs Trinidad Wastewater Plant
Jayeden Serl
Operator at Yuma, City of
Joe Kubitschek
Mr at Town of Deer Trail
Alex Baldwin
Water Systems Operator at Loveland, City of
Daniel Bumgarner
C&D Operator at Pueblo West Metro District
Cynthia Hackel
Purecycle Water
Jan Nelson
Board Member at CRWA
Aaron Averett
Sunrise Engineering
+44 other Attendees