Loading...
This Session has ended

Wastewater and Water Lining Options for Systems through Challenging Areas

17th Mar 8:00am - 8:50am MDT Snowberry- Collections
43 attended
In Person
Session Description

This presentation will focus on case studies where traditional pipeline replacement may be a challenge, but relining could be an option. Relining can be done in wastewater and water pipelines and can be done in such a way to minimize downtime and environmental impacts. This presentation will go over some of the practical applications, when pipe lining is a viable option and when it might not be. Multiple example projects will be presented along with instruction on how to evaluate if a specific project should consider pipe lining as an alternative.

Attendees (43)
Joseph Sandoval
Joel York
Collection System Operator at Upper Thompson Sanitation District
Paul Garel
ORC at Manassa, Town of
Ken Davis
Public Works Director at Town of Dinosaur
Steven DiCamillo
Public Works Director at City of Cripple Creek
Jason Mraz
Engineer inspector at Town of Firestone
Daniel Bumgarner
C&D Operator at Pueblo West Metro District
Lawrence Santistevan
Project Manager at Jacobs Trinidad Wastewater Plant
Bradford Rome
Project Manager at Fraser, Town of
Lee Torres
Operator 1 at Jacobs Trinidad Wastewater Plant
Raymond Garcia
Wastewater Operator at Widefield W&S District
Ronald Smith
Operator at Cheyenne Wells Sanitation District
Farron Hall
none at Hall, Farron
Gibbs Bedenbaugh
Field Tech at Round Mountain Water & Sanitation
David Nameth
Administrative Coordinator at Pueblo West Metro District
JACKSON BYRNES
METER TECHNICIAN at Castle Rock, Town of
+27 other Attendees