This Session has ended
Limited Resources, Lasting Results: In-House Trenchless Pipe Repair
17th Mar
9:00am - 9:50am MDT
Snowberry- Collections
40 attended
Session Description
Identify the structural situations which are conducive to trenchless pipe repair fixes. Including cracks, fractures, breaks, joint separations, root intrusion, and ground-water infiltration. Understand the step-by-step process of trenchless point repair in gravity sewer mains. From preparatory work, resin mixing, patch insertion using a packer, inflation, and curing--to achieve a permanent, structural point repair. Assess the operational benefits of limited resources and manpower by understanding how a minimal crew can perform multiple repairs in a single day, increasing productivity over traditional excavation.
Attendees (40)
Lee Torres
Operator 1 at Jacobs Trinidad Wastewater Plant
Robert Espinoza
ORC at Fort Garland Water & Sanitation
Gerhardt (Gary) Effers
Dual operator at Royal Gorge Bridge Co
Matt Allen
Operations Manager at Upper Thompson Sanitation District
Chance Phillips
Water Operator at Royal Gorge Bridge Co
Troy Rogers
Water Treatment Operator at Town of Silverthorne
Henry Newhouse
Plant Superintendent at Upper Thompson Sanitation District
Nick Newton
Public Works and Utilities Director at Wray, City of
James McAdam
Foreman at Julesburg, Town of
Clayton Peterson
Water and Wastewater Operations Supervisor at Meridian Service Metro
Joseph Sandoval
Peter Huisman
Circuit Rider- Water at CRWA
Nathanael Romig
Collection System Superintendent at Upper Thompson Sanitation District
Patrick Franz
Control Systems Supervisor at Blue Mountain Energy Inc
Trystin Montano
Water tech 3 at Town of Firestone
Farron Hall
none at Hall, Farron
+24 other Attendees